The duration of a pool resurfacing project can vary depending on several factors, including the size of the pool, the extent of the damage or deterioration, the type of resurfacing materials used, and the weather conditions. On average, a typical pool resurfacing project can take anywhere from 1 to 2 weeks. Here is a breakdown of the general timeline:

  1. Preparation (1-2 days): The first step involves draining the pool completely. This can take a day or two, depending on the size of the pool and the efficiency of the drainage system.
  2. Surface Preparation (1-2 days): After draining, the old pool surface needs to be prepared. This involves removing any existing pool Phoenix Pool Resurfacing plaster, tiles, or other materials that are in poor condition. It may also include repairing cracks or other structural issues. The preparation phase can take 1 to 2 days.
  3. Application of New Surface (3-5 days): The actual resurfacing process can take several days. The duration depends on the type of material used. Common pool resurfacing materials include plaster, pebble finish, or tiles. Each material has its own curing time, with plaster typically taking less time than pebble or tile finishes.
  4. Curing and Finishing (3-5 days): After applying the new surface material, it needs time to cure properly. This may take 3 to 5 days or longer, depending on the material and weather conditions. During this phase, water is typically added to the pool gradually to prevent cracking.
  5. Cleaning and Filling (1-2 days): Once the surface has cured, the pool is cleaned to remove any residue or debris. Then, it’s gradually filled with water, which can take 1 to 2 days.
  6. Final Inspection and Touch-Ups (1-2 days): After filling the pool, the contractor will perform a final inspection to ensure everything is in order. Any necessary touch-ups or adjustments are made during this phase.

Keep in mind that unexpected delays can occur due to weather conditions, the discovery of additional repairs needed, or other unforeseen issues. It’s essential to consult with your pool resurfacing contractor to get a more accurate estimate for your specific project, taking into consideration the factors mentioned above.